A model for optimal armature maintenance in electric haul truck wheel motors: a case study
No Thumbnail Available
Date
2004
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
The objective of the work presented in this paper is the determination of an optimal age-based maintenance strategy for wheel motor armatures of a fleet of Komatsu haul trucks in a mining application in Chile. For such purpose, four years of maintenance data of these components were analyzed to estimate their failure distribution and a model was created to simulate the maintenance process and its restrictions. The model incorporates the impact of successive corrective (on-failure) and preventive maintenance on necessary new component investments. The analysis of the failure data showed a significant difference in failure distribution of new armatures versus armatures that had already undergone one or several preventive maintenance actions. Finally, the model was applied to calculate estimated costs per unit time for different preventive maintenance intervals. From the resulting relationship an optimal preventive maintenance interval was determined and the operational and economical consequences and effects with respect to the actual strategy were quantified. The application of the model resulted in the optimal preventive maintenance interval of 14,500 operational hours. Considering the failure distribution of the armatures, this optimal strategy is very close to a run-to-failure scenario. (C) 2004 Elsevier Ltd. All rights reserved.
Description
Keywords
weibull analysis, armatures, electric motors, repairable system, maintenance optimization